Owner: Sydney Metro City & Southwest
Project: Martin Place OSD Works
Engineer: Arup
Main Contractor: JHCPBG JV (John Holland, CPB, Ghella Joint Venture)
Foundation Contractor: BAUER Foundations Australia Pty Ltd
Scope of Works: Construction of ground engineering works:
14 no. Bored piles
1 no. 1200mm diameter bored pile
3 no. 1500mm diameter bored piles
5 no. 1800mm diameter bored piles
2 no. 2200mm diameter bored piles
3 no 2500mm diameter bored piles
1no plunge column within each 2500mm dia pile
CSL & TIP testing in 5no nominated piles
Construction Period: June 2019 to August 2019